This paragraph should be hidden.
Out of stock at Leduc, AB
Quebec residents: For information on maintenance and repair click here.
Auto Services are available at your store
This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.
Helps avoid having to remove and replace fuses when flat towing your vehicle
Vehicle-specific application for a custom fit
Integrates with CURT RV harness (sold separately)
Includes bypass harness, fuse holder and other components
Fuse not included
20-amp max
| Part Number | 58445 |
|---|---|
| Colour | Black |
| End 1 Gender Type | Female |
| End 1 Shape | Flat |
| End 1 Terminal Quantity | 1 |
| End 2 Gender | Male |
| End 2 Shape | Flat |
| End 2 Terminal Quantity | 1 |
| Manufacturer Part Number | 58445 |
| Package Depth (cm) | 22.86 cm |
| Package Depth (in) | 9.00 in |
|---|---|
| Package Height (cm) | 5.08 cm |
| Package Height (in) | 2.00 in |
| Package Weight (kg) | 0.08 kg |
| Package Weight (lb) | 0.17 lb |
| Package Width (cm) | 10.16 cm |
| Package Width (in) | 4.00 in |
| Product Length (cm) | 22.86 cm |
| Product Length (in) | 9.00 in |
| Terminal Type | Lead Wire |
| Wire Gauge (ga) | 16 ga |
| Wire Quantity | 2 |
Pick Up is free at most stores (some stores require a minimum order value before tax)
Shipping fee is based on size and weight of products and distance from address to store
Same-Day Delivery costs $9.99 per order
Same-Day Delivery and Ship to Home are unavailable for tires and wheels
Most products can be returned or exchanged at any Canadian Tire store within 90 days of purchase
Some products are non-refundable and non-exchangeable
Special order hard parts and specific application automotive parts must be returned to original store of purchase
The return info outlined above may not apply to the product you are currently viewing. For complete details and exceptions, please refer to our Return Policy.
