Big Spring Tire Sale: SAVE UP TO 25%* on select tires and wheels from quality brands.

Shop Now
CANADA'S STORE

Credit Offered* Learn More

Support Order Status
FR
UNCONFIRMED FIT
Add your vehicle to confirm fitment and view more product info.
CURT

CURT 58445 Long-Lead Mini Fuse Bypass Switch

#140-4904-2
$92.99
Buy Online :
Pick up at Leduc, AB
Pick up between May 16 - May 22
Quantity updated to 1
Also Find It in Store:
Add to Registry

Quebec residents: For information on maintenance and repair click here.

Need Installation Help?

Auto Services are available at your store

Product Details

This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.

  • Helps avoid having to remove and replace fuses when flat towing your vehicle

  • Vehicle-specific application for a custom fit

  • Integrates with CURT RV harness (sold separately)

  • Includes bypass harness, fuse holder and other components

  • Fuse not included

  • 20-amp max

Part Number 58445
Colour Black
End 1 Gender Type Female
End 1 Shape Flat
End 1 Terminal Quantity 1
End 2 Gender Male
End 2 Shape Flat
End 2 Terminal Quantity 1
Manufacturer Part Number 58445
Package Depth (cm) 22.86 cm
Package Depth (in) 9.00 in
Package Height (cm) 5.08 cm
Package Height (in) 2.00 in
Package Weight (kg) 0.08 kg
Package Weight (lb) 0.17 lb
Package Width (cm) 10.16 cm
Package Width (in) 4.00 in
Product Length (cm) 22.86 cm
Product Length (in) 9.00 in
Terminal Type Lead Wire
Wire Gauge (ga) 16 ga
Wire Quantity 2
Warranty:
  • This product carries a 1 year exchange warranty redeemable at any Canadian Tire store.
Online Ordering:
  • Pick Up is free at most stores (some stores require a minimum order value before tax)

  • Shipping fee is based on size and weight of products and distance from address to store

  • Same-Day Delivery costs $9.99 per order

  • Same-Day Delivery and Ship to Home are unavailable for tires and wheels

  • Online Ordering Information.

Returns:
  • Most products can be returned or exchanged at any Canadian Tire store within 90 days of purchase

  • Some products are non-refundable and non-exchangeable

  • Special order hard parts and specific application automotive parts must be returned to original store of purchase

  • The return info outlined above may not apply to the product you are currently viewing. For complete details and exceptions, please refer to our Return Policy.

Reviews

Questions