CANADA'S STORE

Credit Offered* Learn More

Support Order Status
FR
CURT

CURT Long-Lead Mini Fuse Bypass Switch

#140-4904-2
$92.99
Buy Online :
Pick up at Leduc, AB
Pick up between Jan 23 - Jan 29
Quantity updated to 1
New digital payments available on checkout page:
Also Find It in Store:
Add to Registry

Quebec residents: For information on maintenance and repair click here.

Need Installation Help?

Auto Services are available at your store

Product Details

This long-lead mini fuse bypass switch helps avoid having to remove and replace fuses when flat towing your vehicle. It is designed for vehicle-specific application and integrates with CURT RV harnesses for a custom-fit solution. It includes a bypass harness, fuse holder and other components.

  • Helps avoid having to remove and replace fuses when flat towing your vehicle

  • Vehicle-specific application for a custom fit

  • Integrates with CURT RV harness (sold separately)

  • Includes bypass harness, fuse holder and other components

  • Fuse not included

  • 20-amp max

Part Number 58445
Colour Black
End 1 Gender Type Female
End 1 Shape Flat
End 1 Terminal Quantity 1
End 2 Gender Male
End 2 Shape Flat
End 2 Terminal Quantity 1
Manufacturer Part Number 58445
Package Depth (cm) 22.86 cm
Package Depth (in) 9.00 in
Package Height (cm) 5.08 cm
Package Height (in) 2.00 in
Package Weight (kg) 0.08 kg
Package Weight (lb) 0.17 lb
Package Width (cm) 10.16 cm
Package Width (in) 4.00 in
Product Length (cm) 22.86 cm
Product Length (in) 9.00 in
Terminal Type Lead Wire
Wire Gauge (ga) 16 ga
Wire Quantity 2

Our return policy

View full return policy

Warranty

This product carries a 1 year exchange warranty redeemable at any Canadian Tire store.

Compare Similar Products

Only Show Differences
Ratings
ColourBlack
Colour GroupBlack
End 1 Gender TypeFemale

Reviews

Review this product

Select to rate the item with 1 star. This action will open submission form.
Select to rate the item with 2 stars. This action will open submission form.
Select to rate the item with 3 stars. This action will open submission form.
Select to rate the item with 4 stars. This action will open submission form.
Select to rate the item with 5 stars. This action will open submission form.
Be the first to review this product

No questions have been asked about this product.

Questions

Top